Main
Contractor
Amey Construction Limited
Works
Comprised
Construction of the 300m long Meir Tunnel and associated approach
works forming part of a high standard east-west route linking the
M6 and the M1. The tunnel roof was constructed in a top down method
on top of contiguous piled tunnel walls. Blinding concrete was power
floated to achieve a smooth surface upon which a debonding wax was
applied. Reinforcement was fixed in the normal way and the 1,000mm
thick roof slab cast directly onto the blinding concrete.
The
tunnel was then excavated from below with the blinding concrete
coming away from the main roof slab, the special wax having prevented
any bonding between the two concrete layers. Approach walls and
impact walls were then completed at the tunnel entrances and sides.
|