Main
Contractor
Laing Limited
Works
Comprised
R C Base slab and perimeter retaining walls to a three storey basement
car park/plant areas. Three number concrete stair and lift cores
rising from basement level three to ninth floor total rise approximately
46m per core. Placing concrete to floor slabs on permanent metal
decking basement level three to ninth floor - eleven number suspended
floors in total.
|